
UltraSyntec Refurbishes Warehouse Floor For Schneider Electric
UltraSyntec has successfully won a tender to refurbish a warehouse floor for electrical distributor Schneider Electric’s Leeds storage facility.
Home > Warehousing & Logistics > Page 2

UltraSyntec has successfully won a tender to refurbish a warehouse floor for electrical distributor Schneider Electric’s Leeds storage facility.

Resin flooring contractors Ultrasyntec Ltd., have recently completed a 4,000 Sq. Metre Epoxy Flooring Contract at the RAF Base at Menwith Hill in Harrogate, through Balfour Beatty Construction.

A leading online fashion retailer had just taken ownership of an additional storage facility based in Burnley.

Dogsthorpe fire station was built in the 1970s and was due a full refurbishment to the main station hall.
This job involved mechanically preparing (blastracking) 520 Sq. Metres of concrete flooring to remove the existing epoxy coating.
900 Sq. Metres of concrete floor was mechanically prepared (Blastrack).