Marshall Construction of Elland awarded Ultrasyntec the job creating a highly durable floor finish for the new purpose built Bosch factory in Normanton East Yorkshire.
The specification was for a full “Blast tracking” system to the entire 2500 m2. Then cleaned down with industrial vacuums.
Once the area was clean a DPM (Damp Proof Membrane) primer was applied to stop any moisture releasing out of the new slab.
This was followed by 2 coats of High Build Epoxy Coating in RAL 7035
Both clients were very impressed with the quality and turn- around time in which Ultrasyntec carried out this project.
Before and After



